Date
|
Task
|
What we going to do?
|
Equipment
|
Cast and crew
|
04/01/16 - 05/02/16
|
Pre production
|
This will be the pre production part. I will finish the
scripting and storyboarding. I will also do Recce’s, risk assessments and
shooting schedules.
|
Macs
|
David Cuff
|
29/01/16 - 19/02/16
|
Filming days
|
I will be filming the band footage and the narrative in this time and I will require everyone for this so I can get the band footage done.
|
Nikon D3300 18-55mm Lens 70-300mm telephoto Lens Rode Microphone Rode DeadCat Rode Boom pole Camera Stabilizer Tripod Camera Dolly Action camera |
David Cuff, Callum Hope, Lochlan Hope, Emily Twist, Nathan Fisher ad Jack Bates
|
07/03/16 - 18/03/16
|
Editing
|
This will be when I collect all of the footage together and start putting on a timeline and making the music video
|
Macs
|
David Cuff
|
Thursday, 21 January 2016
Pre Production - production Schedule